Key takeaways
- Lean manufacturing is the discipline of removing everything the customer would not pay for. It started in the Toyota Production System and works in a 20-person fabrication shop as well as in a large plant.
- The 8 wastes (TIMWOODS) give you a checklist for walking the floor: transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills.
- Most 5S drives fade within months because nobody audits them. Give each area an owner, a weekly photo audit and a standard to compare against.
- Start small: map one product’s value stream in an afternoon, fix one bottleneck, and repeat for 90 days.
Lean manufacturing is a simple idea that Indian MSMEs often make complicated: find the work, waiting and walking that add no value for the customer, and remove them one at a time. This guide covers the 8 wastes, 5S, kaizen, value stream mapping and a 90-day plan you can run without a consultant.
What is lean manufacturing, and where did it come from?
Lean manufacturing is a way of running a factory that treats everything the customer does not pay for as waste, and removes it in small, continuous steps. It comes from the Toyota Production System, developed at Toyota after the Second World War and associated with engineer Taiichi Ohno.
Two ideas sit at its core. Just-in-time means making only what is needed, when it is needed, in the quantity needed. Jidoka means building quality into the process, so a machine or operator stops the line when something goes wrong instead of passing a defect forward.
What are the 8 wastes of lean (and the 7 wastes of lean manufacturing)?
The 8 wastes of lean are transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills, remembered as TIMWOODS. The classic list had seven wastes, without unused skills (also called non-utilised talent). Most trainers now teach eight.
Use the list as a walking checklist. Take a part from the gate to dispatch and ask which of the eight you see. Overproduction is the worst because it hides the others: if you make 500 when the order is for 300, you also create inventory, extra handling, extra waiting and a stack of paperwork. The table gives an example from an Indian shop floor and a first fix for each waste. The examples are illustrative, so replace them with what you see on your own floor.
| Waste | Example on an Indian shop floor | First fix |
|---|---|---|
| Transport | Fabricated frames carried across the shed between cutting, welding and painting bays | Redraw the layout so the next process sits beside the last; use a simple spaghetti diagram first |
| Inventory | Pile of semi-finished CNC parts waiting for a deburring operator; raw bar stock bought for six months | Set a maximum stock level per item; mark the floor line and stop issuing against it |
| Motion | Operator walks to the tool crib five times a shift for one gauge | Shadow board and a gauge kept at the machine; 5S the workstation |
| Waiting | VMC stands idle while the first-piece inspection report is awaited | Fix inspection slots by shift; give the setter a ready checklist |
| Overproduction | Packing line in a pharma plant runs a full batch of labels before the order is confirmed | Produce to confirmed dispatch plan; keep a daily order board visible |
| Overprocessing | Extra grinding to a finish the drawing does not call for | Check the drawing; agree the finish with the customer in writing |
| Defects | Food-pack seal failures found at final QC, after the full lot is packed | Inspect at the sealing station; stop and fix the cause, log by reason code |
| Unused skills | A skilled setter only loads parts while the supervisor makes every decision | Let operators run the daily improvement board and own a small fix |
What is 5S in manufacturing, and why do most 5S drives fade?
5S is a five-step workplace method: Sort, Set in order, Shine, Standardise and Sustain. It removes clutter, gives every tool a place, keeps the area clean enough to spot leaks and wear, makes the first three steps routine and then keeps them alive. Most drives fade because the fifth S never gets an owner.
On a real floor, Sort means red-tagging everything not used in the last month and removing it. Set in order means shadow boards, marked floor lanes, labelled bins and a gauge at the point of use. Shine means cleaning as inspection: an oil drip under a press is a maintenance signal, not just dirt. Standardise means a photo of the ‘right’ state at each workstation, so anyone can see a deviation in seconds. Sustain means a weekly audit with a score, one named owner per area and a supervisor who walks it.
Drives fade for predictable reasons. A big clean-up before a customer or ISO audit, no follow-up, and a supervisor who treats it as housekeeping rather than as part of the job. The fix is dull and works: a 10-minute audit by area owners every week, scores posted at the area, and a rule that the lowest-scoring area presents its fix at the monthly review. 5S is also the foundation for maintenance routines, which we cover in our guide to total productive maintenance.
What is kaizen in manufacturing?
Kaizen means continuous improvement: small changes, made often, by the people who do the work. In a factory it works as a weekly habit, not a project. Each operator or team suggests a fix, tries it within days, and records the before and after.
A workable format for a small plant is a board at the shift in-charge’s desk with three columns: problem, trial and result. One fix a week per team is a good pace. Examples: moving a bin 2 metres to cut a walk, or a simple jig so a part loads the right way round. Fifty such fixes in a year change how a shop runs.
How do you do value stream mapping in an afternoon?
Value stream mapping is drawing every step a product takes from customer order to dispatch, noting the time each step takes and the time the part waits between steps. Pick one product family, walk the floor with a notepad and a stopwatch, and draw it on paper in an afternoon.
Do it in four passes. First, list the steps from raw material receipt to dispatch: cutting, machining, welding, painting, inspection, packing. Second, for each step note the cycle time, the number of people, the changeover time and the stock sitting in front of it. Third, add the information flow: how does a work order reach the shop floor, and who decides what runs next. Fourth, total the value-adding time (when the part is actually being changed) and the total lead time. The ratio is usually startling. A part that spends 40 minutes being machined may spend nine days in the plant. The Lean Enterprise Institute describes the method on its page for value-stream mapping.
Then draw the future state: where could stock be limited, which steps could sit next to each other, and which one step sets the pace of the whole line. Pick one change. A map that is not followed by a change is a poster.
Which lean manufacturing tools should an MSME learn first?
Start with five lean manufacturing tools: SMED to shorten changeovers, poka-yoke to make errors impossible, kanban to pull material only when needed, standard work to write down the best known method, and the gemba walk to look at the real place. They cost little and work on any shop floor.
SMED (single-minute exchange of dies) splits changeover work into what must be done with the machine stopped and what can be prepared while it runs. Moving a die, fixture or tooling prep outside the stop time can cut a changeover sharply, which lets you run smaller batches. Poka-yoke means a simple guard: a pin that stops a part loading backwards, a counter that will not let the packer close the carton until 12 items are in. Kanban is a card or empty-bin signal that tells the previous process to make more, so stock stays between a minimum and a maximum.
Standard work is one page with the steps, the time and the quality check, kept at the workstation and updated by the people who do the job. The gemba walk is the manager standing at the place the work happens, every day, asking why. None of these needs software to start. Once they run, a live count of stock, downtime and rejections makes the waste easier to see, and that is where tools built around your own data help. See how at software and automation. A related measure, OEE, is explained in our OEE formula guide.
Is lean better than Six Sigma?
Neither is better; they solve different problems. Lean removes waste and shortens lead time. Six Sigma reduces variation and defects using statistics. Small plants usually get more from lean first, because their losses are waiting, stock and rework. Six Sigma adds value once a process is stable and a defect has a measurable cause.
Lean asks ‘why does this part wait?’ and answers with layout, flow and pull. Six Sigma asks ‘why does this dimension vary?’ and answers with data, measurement system checks and control charts. If you cannot yet say how many pieces you rejected last week and why, start with a simple reason-code sheet.
The Government of India has run a Lean scheme for MSMEs through the Ministry of MSME. I could not confirm on the day of writing whether its financial support is still available, so check the Ministry of MSME website before relying on it.
How do you start lean in 90 days?
Spend the first 30 days on one product and one area: map it, 5S the area, and pick a baseline measure such as lead time or rejection rate. Spend days 31 to 60 on fixes from the map. In days 61 to 90, standardise what worked, start a weekly kaizen board and repeat on a second area.
A plan that Indian MSMEs can run with their own people: week 1, choose the product family that causes most delays and name a lead from the shop floor, not only from the office. Weeks 2 to 3, run a value stream map and a 5S red-tag drive in one area. Week 4, record baseline numbers for lead time, rework and stock in that area. Weeks 5 to 8, implement the top three fixes: a layout change, one SMED trial, one kanban for a fast-moving item. Weeks 9 to 12, write the standard work, start the weekly audit and kaizen board, and compare against your baseline.
Report results in rupees saved on stock and rework, not in posters. A plant that can explain its way of working also sells it better; see B2B branding for manufacturers.
You cannot fix a wait you cannot see. Count the hours a part sits still before you buy a single new machine.— Murtaza Udaypurwala, DESENO
The bottom line
Lean manufacturing is not a programme to buy. It is a habit of seeing waste and removing it every week. Learn the 8 wastes, run 5S with an owner and an audit, hold a weekly kaizen board, and map one value stream before you invest in anything. Start with one product and one area, show the result in time and rupees, and let the shop floor carry it forward.
Frequently asked questions
What is lean manufacturing in simple words?
Lean manufacturing is a way of running a factory that removes everything the customer would not pay for: waiting, extra stock, rework, needless movement. It began in the Toyota Production System and rests on making what is needed, when it is needed, with quality built into each step. It suits small plants as much as big ones.
What are the 8 wastes of lean manufacturing?
They are transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills, remembered as TIMWOODS. The older list had seven wastes and left out unused skills. Overproduction is usually the costliest, because it creates stock, handling and waiting as well.
What is 5S in manufacturing?
5S is a workplace method with five steps: Sort, Set in order, Shine, Standardise and Sustain. It clears clutter, gives every tool a place, keeps the area clean enough to spot problems, and makes the habit routine. It fades without an area owner, a weekly audit and a standard photo to compare against.
What is kaizen in manufacturing?
Kaizen means continuous improvement through small changes made often by the people doing the work. In a factory it works as a weekly routine: raise a problem, try a fix within days, record the before and after, and keep what works. One small fix per team per week adds up to a big change over a year.
Is lean better than Six Sigma?
Neither is better. Lean removes waste and shortens lead time, while Six Sigma uses statistics to cut variation and defects. Small plants usually gain more from lean first. Six Sigma pays off when a process is stable and a defect has a measurable cause. Many factories use both together.
How do you do value stream mapping?
Pick one product family and walk it from customer order to dispatch. Draw each step, and note cycle time, changeover time, people and the stock waiting before it. Add how work orders reach the floor, then total the value-adding time against the total lead time. Draw a future state and pick one change.