    • Total productive maintenance (TPM) makes operators and maintenance staff jointly responsible for equipment, with 5S as the foundation and eight pillars on top.
    • Start with autonomous maintenance on one bottleneck machine: clean, inspect, lubricate, tighten, and log what you find.
    • A starter preventive maintenance schedule needs daily, weekly, monthly and yearly checks per machine type, and a breakdown log that records start, end, cause and fix.
    • CMMS software pays off when the register or Excel can no longer keep up. Habit first, tool second.

    Total productive maintenance (TPM) is a way of running a plant so that operators and maintenance staff share the job of keeping machines healthy, to cut breakdowns, small stops and defects. This guide covers the eight pillars, the types of maintenance and a preventive schedule you can start this month.

    What is total productive maintenance and where did it come from?

    Total productive maintenance is a plant-wide approach in which everyone, from operator to top management, takes part in keeping equipment reliable, with the goal of zero breakdowns, zero defects and zero accidents. It grew out of Japanese industry, and Seiichi Nakajima developed it between 1950 and 1970.

    TPM was first applied in 1971, and Nippondenso, a Toyota parts supplier, was among the early winners of the maintenance prize. The Japan Institute of Plant Maintenance (JIPM) later expanded it into company-wide TPM with eight activities. The core idea is a change in who owns the machine. In many Indian plants, the operator runs and the maintenance team repairs, and each blames the other when it stops. TPM puts routine care in the operator’s hands, so the maintenance team can focus on planned and skilled work. See the TPM overview for the history. TPM also improves OEE, which our guide on the OEE formula shows how to measure.

    What are the 8 pillars of TPM, with a shop-floor example of each?

    The 8 pillars of TPM are autonomous maintenance, planned maintenance, focused improvement, quality maintenance, early equipment management, education and training, office TPM, and safety, health and environment. 5S sits underneath as the foundation. Here is a plain example for each pillar.

    Autonomous maintenance: the VMC operator wipes the machine, checks the coolant level and tightens a loose guard every shift. Planned maintenance: the maintenance team services the spindle chiller on a calendar, not after it fails. Focused improvement: a small team studies why one press stops 15 times a week and removes the cause. Quality maintenance: you find that a worn locator causes a dimension to drift, and fix the locator, not just the part. Early equipment management: when buying a new machine, maintenance and operators review the design for easy cleaning and access. Education and training: operators learn to spot a leak or a noise before it grows. Office TPM: the same loss-hunting applied to order entry, purchase and dispatch paperwork. Safety, health and environment: guards, lockout and tagout, and oil spill control.

    5S (sort, set in order, shine, standardise, sustain) is the base. A clean machine shows leaks, cracks and loose parts. Lean manufacturing, 5S and kaizen covers it in detail.

    What are the benefits of implementing TPM?

    The benefits of implementing TPM are fewer breakdowns and small stops, steadier quality, longer machine life, a safer floor, and operators who understand their machines. The size of the gain depends on the plant, so measure your own baseline first and compare after six months.

    We do not quote percentage gains here because they vary by plant and by how seriously the programme is run. What you can do is track four things before and after: breakdown hours per month, number of stops, rejection rate and OEE. The benefits are easiest to see on a bottleneck machine, where each recovered hour is an extra hour of saleable output. There are softer gains too. When an operator owns a machine, he reports the odd sound or heat on day one, not after the bearing fails. Maintenance staff move from firefighting to planned work. And shift in-charges get a common language for discussing losses, which makes the morning meeting shorter.

    What are the types of maintenance?

    The main types are breakdown (run to failure), preventive (time-based), predictive (based on measured condition), condition-based, corrective (repair and improve after a fault) and autonomous (operator care). Some lists give seven types, adding planned and improvement maintenance. Most plants use a mix.

    Breakdown maintenance means fixing it after it stops. It is acceptable for cheap, non-critical items such as a lamp and a disaster for a bottleneck spindle. Preventive maintenance means servicing on a calendar or running hours, whether or not it looks worn. Predictive and condition-based maintenance mean measuring something, such as vibration, temperature, oil condition or current draw, and acting when it crosses a limit. Corrective maintenance fixes a fault and removes its cause. Autonomous maintenance is the daily operator routine. The 80/20 rule in maintenance is a rule of thumb that a small share of machines and causes, often cited as about 20%, produce most of the downtime. Do not trust the ratio; rank your own breakdown log by hours lost, and the same few machines usually top it.

    What does a starter preventive maintenance schedule look like?

    A starter preventive maintenance schedule lists checks by machine type and frequency: daily by the operator, weekly and monthly by the maintenance team, yearly for major work. Start with your bottleneck machines. The table is a sample to adapt to your manuals, not a substitute for the maker’s schedule.

    Always follow the machine manufacturer’s manual first, and adjust frequencies using your own breakdown history.

    MachineDaily (operator)WeeklyMonthlyYearly
    CNC / VMCClean chips, check coolant level and way-lube, listen for noiseClean filters, check air pressure and drain moistureCheck spindle taper, belts, coolant concentrationGeometry and alignment check, spindle service
    Air compressorDrain moisture, check oil level, check for leaksClean air filter, check belt tensionCheck safety valve, clean cooler finsOil and filter change, pressure vessel inspection as required
    Press (mechanical or hydraulic)Check guards and light curtain, lubricate points, check for leaksCheck clutch and brake, tighten fastenersCheck die height and bed parallelismOverhaul clutch and brake, overload test
    Hydraulic systemCheck oil level and temperature, look for leaksCheck hoses and fittings, clean breatherSample oil, check filter indicator, check accumulatorChange oil and filters as per oil analysis
    Starter preventive maintenance schedule (sample; follow each maker’s manual)

    How do you log breakdowns and read MTBF and MTTR?

    Keep a breakdown log with machine, date, start and end time, symptom, cause, fix, spare used and who repaired it. From it, MTBF (mean time between failures) is run time divided by number of failures, and MTTR (mean time to repair) is total repair time divided by number of repairs.

    An example with made-up numbers: a machine runs 400 hours in a month and fails 4 times, so MTBF is 100 hours. The four repairs took 2, 1, 5 and 4 hours, so 12 hours in total, and MTTR is 3 hours. A rising MTBF means failures are getting rarer. A falling MTTR means your team repairs faster, perhaps because the right spare is now in stock. Rank breakdowns by hours lost and by cause: electrical, hydraulic, mechanical, operator error or tooling. The top item is where to point your first focused improvement team. Without a log you will repeat the same repair every month and never see it.

    If the same machine is on the breakdown list three months running, it is not bad luck. It is a repair you keep paying for instead of a cause you refuse to fix.— Murtaza Udaypurwala, DESENO

    When is CMMS software worth it?

    CMMS (computerised maintenance management system) software is worth it when your register or Excel can no longer schedule work orders, track spares and show history across many machines. Under about 10 machines, a well-kept register or sheet often does the job. Fix the routine first.

    Signs you are ready for CMMS: preventive tasks are missed because nobody sees the due list; spares run out unnoticed; machine history is in someone’s head; and management asks for breakdown reports that take a day to compile. A CMMS gives work orders, due-date alerts, spare stock, and MTBF and MTTR reports. A packaged CMMS is one route. Another is a small custom tool that reads your machine list and breakdown sheet, sends a due-today alert to the maintenance in-charge and shows a monthly downtime chart. Our software and automation work builds this around your existing sheets. Either way, the tool only holds what people put in, so keep the daily operator routine as the first step.

    For the sales side of filling the capacity you free up, see how to get orders for a CNC machine shop.

    Do this: Pick your single most important machine. Print a one-page daily checklist with five operator checks, put it on the machine, and ask the operator to tick it each shift for 30 days. Review the notes with maintenance every Friday.

    The bottom line

    Total productive maintenance is less about a programme than a habit: operators care for the machine daily, maintenance plans the rest, and every breakdown is logged and traced to a cause. Start with one bottleneck machine, a checklist, and a log. Add CMMS software only when paper stops coping.

    Frequently asked questions

    What is total productive maintenance?

    Total productive maintenance is a plant-wide approach where operators, maintenance staff and management share responsibility for equipment reliability. It aims for zero breakdowns, defects and accidents, using autonomous maintenance, planned maintenance and 5S. It originated in Japan and is linked to the Japan Institute of Plant Maintenance.

    What are the 8 pillars of TPM?

    They are autonomous maintenance, planned maintenance, focused improvement, quality maintenance, early equipment management, education and training, administrative or office TPM, and safety, health and environment. 5S forms the foundation under all eight, because a clean, ordered machine shows its faults early.

    What are the benefits of implementing TPM?

    Fewer breakdowns and small stops, steadier quality, longer machine life, a safer floor and operators who understand their machines. The size of the gain varies by plant, so record breakdown hours, stops, rejection rate and OEE before you start, and compare after six months.

    What are the 7 types of maintenance?

    Commonly listed types are breakdown, preventive, predictive, condition-based, corrective, planned and autonomous maintenance. Lists differ between books, and some count planned and improvement maintenance as separate types. Most factories use a mix: breakdown for cheap non-critical items, preventive for critical machines and autonomous care by operators every shift.

    What is the 80/20 rule in maintenance?

    It is a rule of thumb that a small share of machines or causes produces most of the downtime. The exact split varies, so do not assume 80/20. Rank your own breakdown log by hours lost, and the few machines or causes at the top are where to focus first. Fixing those few usually removes more downtime than spreading effort evenly across every machine.

    What is the difference between preventive maintenance and TPM?

    Preventive maintenance is one activity: servicing equipment on a schedule. TPM is a wider programme that includes preventive maintenance, adds daily operator care, loss-hunting teams, training and safety, and measures results through OEE. Preventive maintenance is a part of TPM, not a replacement for it.

    AG

    Written by

    Akash Garg

    DESENO Media Agency

    Akash Garg is the Co-Founder of DESENO Media Agency. He leads growth and performance for the agency's real-estate, hospitality and D2C clients across India.

    How DESENO can help

    Services built for what you just read

    All DESENO services  ·  All case studies  ·  Talk to us

    Keep reading

    Related articles

    Chat with us