Manufacturing

Job Card Format for Manufacturing (Plus Work Order and Daily Production Report Formats)

AG
Akash GargDESENO Media Agency
·Published November 19, 2026 ·13 min read
A clipboard of blank cards beside calipers, one edge glowing coral pink.
On this page

    Key takeaways

    • A job card follows one job through the shop floor and records what was made, on which machine, by whom, how long it took and how many pieces were good. Without drawing revision and time on it, it is only a slip of paper.
    • A work order authorises production. A job card records execution. A daily production report summarises a shift. Each answers a different question.
    • Link the three with one job number from the customer PO to dispatch, and capture rejection reason codes at source.
    • Paper or Excel works for a small shop. Move to a tablet form or simple system when you cannot answer ‘where is job 1042?’ in under a minute.

    A good job card format fits on one page, travels with the material and tells you at dispatch exactly what happened to the job. Below is a job card format you can copy, then the work order format, the daily production report format and a maintenance job card, and how the four connect.

    What is a job card format for production, and which fields must it have?

    A production job card is a one-page record that travels with a job through every operation. It shows what to make, from which material, on which machine, who ran it, how long it took, and how many pieces were good, rejected or reworked. The table lists the fields to print.

    The fields people most often leave out are the drawing revision, the material lot or heat number and the time stamps, and these three cause the most trouble later. A job made to revision B when the customer moved to revision C is a scrap lot. A shaft with no heat number cannot be traced to its material test certificate. And a card without start and end times cannot tell you what the job really cost, which matters when you quote the repeat order.

    Print it on thick A4 or A5 paper that survives oil. Leave a remarks column: operators write the real story there, such as ‘tool broke at piece 40’.

    SectionFieldWhy it is on the card
    HeaderJob card no., date, customer and PO no., due dateOne number links the card to the order and to dispatch
    PartPart name, part code, drawing no. and revisionStops work to an old revision
    MaterialMaterial grade, size, lot or heat no., issue quantityTraceability and material test certificate matching
    QuantityOrdered, planned (with allowance), finishedShows scrap allowance against the order
    Operation linesOperation no. and name, machine or work centre, operator, tool or fixtureRoutes the part and names who ran it
    TimeSetup time, run time per piece or batch, start and end date-time, stoppage reasonReal cycle time for costing and for capacity planning
    Counts per operationOK qty, rejected qty with reason code, rework qtyYield by operation, not only at the end
    QualityIn-process check values, final inspection result, inspector sign-offEvidence that the lot was checked
    DispatchPacked qty, challan or invoice no., dispatch date, remarksCloses the card and the job
    Job card format for manufacturing: the fields to print, and why each is there

    How do you fill the job card on the shop floor?

    The planner fills the header, part and material fields when the job is released. Each operator then records their own operation line: start, end, setup, OK, rejected and rework counts. The inspector signs the quality section, and stores or dispatch closes the card. One person per box, filled at the time, not at the end of the shift.

    The common failure is filling the card at the end of the day from memory. Times become round numbers and rejections vanish. Put the card in a clear sleeve at the machine and let the shift in-charge check it at each shift change.

    Where the job goes out to a vendor, the card must say so. Under GST, goods sent for job work must be covered by a delivery challan issued by the principal, and inputs must normally come back within one year and capital goods within three. The GST Council’s job work flyer explains the rule. Note the challan number on the card, and check the current rules with your tax consultant.

    What is a work order format, and how is it different from a job card?

    A work order is the document that authorises production of a defined quantity of a product by a due date. A job card records how the work was carried out. A purchase order is the customer’s request to you, and sits above both. One PO can create several work orders, and one work order can create several job cards.

    A work order format needs: work order number, date, customer and PO reference, product and part code, drawing revision, quantity, due date and priority, bill of materials or material required, routing (the list of operations in order), the planned machine for each, special instructions (a customer’s inspection plan, packing instruction) and approval by the production head. The job card is the floor document. If your shop is small, the two can be the same sheet with the planner’s section at the top. As volume grows they separate, because planners release many job cards from one work order, split by batch, shift or machine.

    This is the link to production planning. Release work orders against real machine capacity, not against hope; our guide to production planning and control covers loading and scheduling in detail.

    What does a daily production report format look like?

    A daily production report summarises one shift or day: which machines ran, what each made against target, how long each stood idle and why, and what was rejected. It should fit on one page and be on the plant head’s desk before the next morning’s meeting.

    Use one row per machine per shift. Columns: date, shift, machine, operator, job card no. and part, target quantity, actual quantity (OK), rejected, rework, planned hours, run hours, downtime in minutes with a reason code (no material, tool change, breakdown, power, waiting for inspection, no operator) and remarks. Reason codes matter more than the minutes: a shop that knows it lost 6 hours to ‘waiting for material’ has a stores problem, not a machine problem.

    The daily report is built from the job cards. If the cards are filled at the time, the report is a five-minute total. If it takes an hour, the cards are not reliable. The same reason codes feed the loss analysis in our OEE formula guide.

    What is a job card format for maintenance?

    A maintenance job card records one repair or service on one machine: what was reported, what was found, what was done, which spares were used and how long the machine was down. It is the same idea as a production card, but for the machine instead of the part.

    Fields: card no., date and time reported, machine name and asset code, reported by, problem description, breakdown or planned (preventive) type, assigned technician, time started and finished, root cause, action taken, spares used with quantity, downtime in minutes, and sign-off by the production in-charge. A year of history per machine shows which fail most and which spares run out. That is the base for any maintenance programme; our total productive maintenance post builds on it.

    The link back to production is the downtime reason code. When a maintenance card is closed, the same minutes should show on that shift’s production report, with the same code. When the two disagree, one of them is being filled in from memory.

    How do job card, work order and production report link from order to dispatch?

    Use one job number that runs through all of them. Customer PO becomes a work order, the work order releases one or more job cards, the cards feed the daily production report, and the closed cards trigger inspection release, packing and dispatch. Costing, covered next, reads the same numbers.

    Picture a PO for 2,000 brackets. Planning raises WO-1042 with a routing of cut, bend, weld, paint, inspect. It releases two cards, JC-1042-A and JC-1042-B, 1,000 pieces each, so two shifts can run in parallel. Each operation line on each card reports its OK and rejected counts. The daily report adds them up by machine and shift. When both cards close, the inspector releases the lot, stores packs it and the dispatch challan quotes WO-1042.

    The same numbers give you the cost of the job: machine hours from the cards, rejection counts from the cards and material from the issue slips. Our guide to product costing shows how to turn them into a cost per unit.

    If an operator cannot fill the card in under two minutes, the card is wrong, not the operator. Make the format fit the work, and the data you get will be worth reading.— Murtaza Udaypurwala, DESENO

    What mistakes make job cards useless?

    Five mistakes make job cards useless: no drawing revision, no start and end times, free-text rejection reasons instead of codes, cards filled at the end of the shift and cards that are never read after the job closes.

    No revision means old drawings keep running. No time capture means you cannot cost a repeat order, so you quote from habit. Free-text reasons (‘bad’, ‘problem’, ‘issue’) cannot be counted: a list of 8 to 12 codes can, such as dimension out, burr, surface damage, material defect, wrong setting, tool break. End-of-shift filling produces rounded times and forgotten rejects. The last mistake is the quietest. A box of closed cards in a cupboard is a dead archive. Once a week, take the ten latest closed cards and compare planned and actual time, and check what the top rejection code was. That is where the improvement is.

    When should you move job cards from paper or Excel to a tablet form or system?

    Move when you can no longer answer ‘where is job 1042 and how many are done?’ within a minute, when end-of-day data entry takes someone more than an hour, or when you run more than about three shifts or machines of mixed jobs. Until then, a good paper card and one Excel sheet are fine.

    A production job card format in Excel suits a small shop: one sheet for work orders, one for card lines, drop-down lists for reason codes and a summary sheet using formulas. It breaks when two people edit the same file, when someone overwrites a formula and when nobody trusts the numbers. The next step is usually not a big system. It is a simple tablet or phone form at the machine that writes to a shared table, feeds a live status board and a daily report, and sends an alert when a job is late. That is the kind of tool DESENO builds around how a plant already works, usually beside your Tally or existing software, not instead of it: see software and automation.

    Do this: Print the format in the table, run it on three live jobs for two weeks, and note every field the operators skip. Cut those fields or fix why they are skipped, then roll the card out to the whole floor.

    The bottom line

    A job card, a work order and a daily production report are three views of one job. Use a single job number, capture drawing revision, time and reason-coded rejections at the machine, and review the closed cards weekly. Start on paper or Excel. Move to a tablet form when the data starts to matter more than the card.

    Frequently asked questions

    What is a job card in manufacturing?

    A job card is a one-page record that travels with a job through the shop floor. It lists the part, drawing revision, material and quantity, then each operation with the machine, operator, setup and run time, and OK, rejected and rework counts. Inspection and dispatch sign it off, so it closes the job.

    What is the job card format for production?

    A production job card has a header (card number, customer, PO, due date), part details with drawing revision, material and lot number, quantity, operation lines with machine, operator and times, OK, rejected and rework counts, inspection sign-off and dispatch details. Add a remarks column. Keep it to one page.

    What is the difference between a work order and a job card?

    A work order authorises production of a quantity by a due date and carries the routing and material needed. A job card is the floor record of how the work was done, with times and counts. One work order can release several job cards, split by batch, machine or shift.

    What is a daily production report format?

    It is a one-page summary of a shift or day with one row per machine: date, shift, machine, operator, job and part, target and actual quantity, rejected and rework counts, run hours, downtime minutes with a reason code, and remarks. It is totalled from the job cards, so reliable cards make it quick.

    Can I keep a production job card format in Excel?

    Yes, for a small shop. Use one sheet for work orders, one for card lines, drop-down lists for reason codes and a summary sheet. Excel breaks down when several people edit one file, formulas get overwritten or data entry runs behind. At that point a tablet form feeding a shared table works better.

    What should a maintenance job card include?

    It should show the card number, date and time reported, machine and asset code, problem description, breakdown or planned type, technician, start and finish times, root cause, action taken, spares used, downtime in minutes and sign-off. Keep the cards by machine, so a year of history shows repeat failures and spares gaps.

    AG

    Written by

    Akash Garg

    DESENO Media Agency

    Akash Garg is the Co-Founder of DESENO Media Agency. He leads growth and performance for the agency's real-estate, hospitality and D2C clients across India.