Key takeaways
- Product costing adds up three things for every unit: direct material, direct labour and manufacturing overhead. Miss the third and you price below cost without knowing it.
- Cost of production = direct material + direct labour + direct expenses + factory overhead. Prime cost is the first three; conversion cost is labour plus overhead.
- Absorb overhead with a machine-hour rate, not a flat percentage. An illustrative VMC at 65% utilisation costs about ₹895 an hour; at 40% it costs about ₹1,450.
- Add a scrap allowance, then margin. A quote built from a competitor’s rate hides which parts lose money.
Product costing is the work of finding what one unit really costs you to make, so that the price you quote earns a margin on every part and not only on the easy ones. This guide gives the cost of production formula, a machine-hour rate calculation and a worked rupee example.
What is product costing, and what are the three main types of product costs?
Product costing is the process of adding up everything it takes to make one unit or one batch. The three main types of product costs are direct materials, direct labour and manufacturing overhead. Together they give the cost of production, which is the number your quote must clear.
Direct material is what goes into the part and can be traced to it: bar stock, sheet, resin, ingredients, packing that ships with the product. Direct labour is the wage of the people who work on it. Manufacturing overhead is everything else it takes to run the factory: power, machine depreciation, maintenance, tooling consumables, rent, supervisors, stores and quality staff. These are indirect: you cannot point at a bolt and say how much of the supervisor it consumed, so you apportion them.
Many MSMEs price from a competitor’s rate or from last year’s rate. That works until a part has a long setup, a hard material or a high rejection rate and quietly loses money. In a shop with 40 part numbers, a few usually do. Without a cost per part you cannot tell which. Costing is how you find them. The Institute of Cost Accountants of India (ICMAI) is the professional body for cost accounting in India; for statutory cost records, ask your cost auditor or consultant.
What is the cost of production formula?
Cost of production = direct material + direct labour + direct expenses + factory overhead. Divide it by the number of good units to get the cost per unit. Prime cost is the first three items. Conversion cost is direct labour plus factory overhead, the cost of turning material into product.
Add administration and selling overheads and you reach the cost of sales. Add your margin and you reach the selling price. Keep the steps separate, because each answers a different question. Prime cost tells you what the part itself consumes. Conversion cost tells you how expensive your process is. Cost of production tells you the minimum you can accept for the part. The formula for cost per unit is the total cost of the batch divided by the good pieces, not the pieces started. If you start 500 and 485 pass, divide by 485.
COGS (cost of goods sold) is different. COGS = opening stock of finished goods + cost of goods manufactured − closing stock. It is an accounting figure for a period and answers ‘what did the goods I sold cost me?’. Cost of production is a per-job figure used before you sell. You need the second for quotes and the first for your profit and loss account.
How do you do a machine hour rate calculation?
Add every annual cost of running a machine, then divide by the hours it will realistically produce. Include depreciation, interest on the loan, power, operator, tooling and coolant, maintenance and a share of floor space and overheads. Divide by productive hours, not calendar hours. Utilisation is the biggest lever.
Take an illustrative ₹30 lakh VMC. Depreciation over 8 years is about ₹3.75 lakh a year. Add 9% interest of ₹2.7 lakh, power ₹1.2 lakh, operator ₹2.4 lakh, tooling and coolant ₹1.5 lakh, maintenance ₹0.6 lakh and floor space and overheads ₹1.8 lakh. The total is ₹13.95 lakh a year. One shift of 8 hours over 300 days is 2,400 hours. At 65% utilisation that is 1,560 productive hours, so the rate is about ₹895 an hour. At 40% utilisation (960 hours) the same machine costs about ₹1,450 an hour. These are illustrative figures, so use your own.
Calculate one rate per machine type, not one for the whole shop. A VMC, a lathe and a press brake have different costs, and a single average rate overcharges simple jobs and undercharges complex ones. Our guide to getting orders for a CNC machine shop shows how the rate shapes quotes and why idle hours are the real enemy. Recalculate every six months, or when power tariffs, wages or a major repair change the inputs.
How do you calculate product cost for one machined part? A worked example
Take an illustrative EN8 steel component, batch of 500, 6 minutes on the machine per piece, using the machine-hour rate above, rounded to ₹900 including the operator. Material, machining, setup, tooling, job work, inspection, overhead, a 3% rejection allowance and 15% margin together give a quote of about ₹204 a piece before GST.
The table shows the build-up. All figures are illustrative: your materials, rate and cycle times will differ. Here the operator’s wage sits inside the machine-hour rate, so direct labour is shown only for the inspection and packing helper. If you list operator wages separately, remove them from the rate so they are not counted twice.
Look at what the table tells you. Material is a third of the cost, and machining is half. A 10% error in the machine-hour rate moves the quote by about ₹9 a piece, or ₹4,500 on the batch. A slow setup matters little at 500 pieces (₹2.70 each) but would add ₹27 a piece if the batch were 50. The same drawing at a quantity of 50 is a different product. Price it separately.
| Cost element | How it is worked out | ₹ per piece |
|---|---|---|
| Direct material | 0.60 kg bar at ₹90 per kg | 54.00 |
| Machining | 6 min = 0.1 hr at ₹900 machine-hour rate (operator, power, depreciation included) | 90.00 |
| Setup | 90 min = 1.5 hr at ₹900, spread over 500 pieces | 2.70 |
| Tooling and inserts | Allowance from tool consumption record | 6.00 |
| Heat treatment (job work) | Vendor rate per piece | 8.00 |
| Inspection and packing | Helper time per piece | 3.00 |
| Subtotal: manufacturing cost | 163.70 | |
| General factory overhead | 5% for supervision, stores and quality | 8.19 |
| Rejection allowance | 3% of cost, from past reject rate | 5.16 |
| Cost of production | 177.05 | |
| Margin | 15% on cost | 26.56 |
| Quote price per piece | 203.61 |
What are the product costing methods: job, batch and process costing?
Job costing tracks cost for each custom order, batch costing for each lot of identical items, and process costing averages cost across continuous production. Pick by how your factory works: job costing for job shops and fabricators, batch costing for components and packed goods, process costing for chemicals, cement or flour.
Job costing suits a CNC or fabrication shop where each PO is different. You collect material, labour and machine hours against one job number, which is where a job card format earns its keep; see our job card format guide. Batch costing works when you make 1,000 identical brackets in one run: cost the batch, divide by the good pieces. Process costing totals the cost of a department over a month and divides by units output, because nobody can trace cost to one litre. Some plants use two: batch costing for packing and process costing for the base product.
A second choice is standard versus actual costing. Standard costing sets an expected cost for each part (material at a set price, hours from the routing, overhead at a set rate). You then compare actual with standard each month. The difference is the variance: material price, usage, labour efficiency and overhead. Actual costing records what really happened. Many MSMEs use standard costs for quoting and actual costs from job cards for review, and the gap between them shows where money leaks.
How do you turn cost into a quote, and what should a product costing template hold?
Take the cost of production, add the margin you need, then check the result against what the market will pay. If the market price is below your cost plus a minimum margin, either reduce cost, refuse the order or accept it knowingly as filler for idle hours. Never accept it by accident.
A product costing template can be one Excel sheet per part: part code and drawing revision, batch size, material weight and rate, a row per operation with machine type, minutes per piece and rate, setup hours, tooling, outsourced processes, overhead percentage, rejection allowance, margin and the resulting price. Add a second sheet for machine-hour rates and a third for material rates, so changes flow through to every part. Version the sheet by date; a quote that refers to an old rate is an argument waiting to happen.
Quote tiers matter. The setup cost spreads over the batch, so a price for 50 pieces is higher than a price for 500. State the tier on the quote. Then chase it: our guide to quotation follow-up emails covers what to send on day two and day five. A fast and accurate quote wins more orders than a low one.
A job you cannot cost is a job you are guessing on. Find the three parts that quietly lose money, and you have found next year’s margin.— Murtaza Udaypurwala, DESENO
How do you cost jobs from live data instead of last year’s sheet?
Cost from live data by pulling actual hours, rejections and material issues from job cards, then comparing them with the standard in the quote. This tells you which jobs made the margin you expected, which did not and why, while there is still time to reprice the repeat order.
Most plants hold the data already: material issues in Tally, hours and counts on job cards, wages in a payroll sheet. The gap is joining them. DESENO builds custom dashboards, reports and alerts around how a factory works, connecting the sheets and exports a business already uses, usually without replacing the software it has. A job-wise costing view could show planned against actual hours per job, scrap by reason and margin by customer. See our software and automation work. Until then, a weekly review of ten closed jobs from the job card file does most of the job.
The bottom line
Product costing is a few steps: trace material, apply a machine-hour rate, add overhead, allow for scrap, then add margin. Do it for your top five parts this month. You will probably find one or two that lose money and a few that earn more than you thought. Then make the habit permanent: cost from the job cards, review variance monthly and reprice before the repeat order.
Frequently asked questions
What are the three main types of product costs?
The three main types of product costs are direct materials, direct labour and manufacturing overhead. Direct materials and labour can be traced to a unit. Overhead, such as power, depreciation, maintenance and supervision, is shared and has to be apportioned, often through a machine-hour rate. Together they make the cost of production.
What is the cost of production formula?
Cost of production = direct material + direct labour + direct expenses + factory overhead. Divide the total by the good units produced to get cost per unit. Add administration and selling overhead to reach cost of sales, then add margin to reach the price.
How do you calculate product cost?
Add the material cost, the machine time at your machine-hour rate, setup spread over the batch, tooling, outsourced processes, inspection and packing, and a share of factory overhead. Add a rejection allowance, divide by good pieces, then add margin. Work one part at a time and keep a dated sheet.
What is the machine hour rate?
It is the total annual cost of running a machine divided by the hours it actually produces. The cost includes depreciation, interest, power, operator, tooling, maintenance and share of space. Because the divisor is productive hours, low utilisation raises the rate sharply. Each machine type needs its own rate.
What is the difference between COGS and cost of production?
Cost of production is the cost of making a unit or batch, used for quoting. COGS (cost of goods sold) is an accounting figure for a period: opening finished stock plus cost of goods manufactured minus closing stock. It tells you what the goods you sold cost, and goes into your profit and loss account.
Which product costing method suits a job shop?
Job costing suits job shops, fabricators and CNC shops, because each order differs. Collect material, hours and rejections against one job number, then compare actual with the quote. Batch costing suits repeat lots of identical parts, and process costing suits continuous production such as chemicals, flour or cement.